HOW IT GOES

Our Process

Four stages. At any point you should be able to say which one you are in and what happens next.

THE FOUR STAGES

What happens from first walkthrough to final handoff

01

Consultation

We walk the space with you and talk about what the rooms need to do, not what products go in them. For a basement that means measuring to the bottom of the ducts and beams, finding the panel and the mechanical room, and looking at where an egress window could realistically go. You get an honest read on budget range at this visit — a range, not a number, because a number before scope is a guess dressed up.

02

Planning & Estimate

Scope written down, drawings where the job or the jurisdiction needs them, the permit path identified, and a written price with its assumptions visible. If something is an allowance rather than a fixed cost, it says so. Allowances hidden inside a total are the most common reason a final invoice surprises somebody.

03

Construction

One point of contact, a schedule, and the trades sequenced so that nobody is waiting on anybody. Inspections get booked in advance rather than after the work is ready. Changes go in writing, priced, before they happen.

04

Final Walkthrough

We walk the finished work with you and build the punch list together rather than handing you a form. It gets closed out before the final payment, not after.

Before We Start

What we need from you

Three things, and being straight about them early makes the whole project easier. A realistic budget range — we can design to a number, but not to one nobody has said out loud, and the earlier that number is honest, the fewer redesigns it costs later. Decisions on selections made at the points the schedule actually needs them, because a kitchen waiting on a cabinet choice is a kitchen not being built, and a crew standing idle is a schedule slipping regardless of how well it was planned. And a single decision-maker where possible — projects with two people giving different instructions cost more and take longer, every time, because the crew ends up building twice or waiting for an answer neither of you has agreed on yet.